Leetsdale Repaving April-September 2020
On April 6, CDOT crews will begin work on Leetsdale Dr. between Mississippi Ave. and Colorado Blvd. Work on this project will include asphalt removal, asphalt SMA, concrete sidewalk and curb ramp work, and roadway re-striping. Medians governing left turns will be added.